Customer Log in

Search

References

WEST-RU Transportation Systems Division has fulfilled over 100 engineering projects in cooperation with international partners.

Many world-wide projects were executed together with our partners FMW Industrieanlagenbau GmbH (Austria) and CIMPROGETTI (Italy)

  • MONDI RUZOMBEROK SCP, Slovakia
  • MONDI PACKAGING, Austria, Czech, Poland
  • VCP TRES LAGOAS, Brazil
  • USER WEYERHAEUSER, USA
  • MONDI FRANTSCHACH, Austria
  • ARACRUZE, GUAIBA, Brazil
  • BIOWOOD AS, Norway
  • GP BRUSWICK,USA
  • PRICE MARYVALE, Austria
  • BAHIA PULP, Brazil

In Russia WEST-RU Transportation Division has participated in complex projects consisting of design, manufacturing, installation and ramp-up with our partner WEST-RU Production

  • Hood installation for GM, S. Petersburg, Russia
  • Robotic welding cell for Renault, Moscow, Russia
  • Steel structures for body shop for Daimler, Nizhny Novgorod, Russia
  • Assembly of chassis and car body for PCMA, Kaluga, Russia
  • Buffer of car bodies for body shop for Ford, Elabuga, Russia
  • Transportation for body shop for Renault, Moscow, Russia
  • Turning welding stations for LIAZ, Likino, Russia
  • Buffer of car bodies for paint shop for Ford, Elabuga, Russia

Success Story. Ilchmann Fördertechnick and WEST-RU Group cooperation

"Schüttgut" Nr.4 2015

In two ongoing parallel large projects with a total of 150 conveyors two WEST-RU engineers took over various design tasks. How did this cooperation work? "WEST-RU chose two English speaking engineers from Nizhny Novgorod in Russia. These two engineers visited our office to Bickenbach and within two weeks familiarized themselves with the technology. They brought all necessary hard- and software, which could be easily integrated into our system and network with them. After successful familiarization, they traveled back to Russia and continued from there for next four months to complete all the design tasks for us. After completion of individual designs, the drawings where transferred via FTP to our server. Occasional brief conversations via telephone or Skype in Russian or English were necessary. This concept ensured high quality solutions and punctual delivery.. The cooperation executed on schedule, with high quality and in the end was very satisfying for us!" He continued: "We tend to face increasingly shorter delivery times. Short delivery times always mean temporary increase in manpower, so external service providers certainly will always come into play." Tim Ilchmann, Ilchmann Fördertechnik

learn more